This set of Basic Civil Engineering Multiple Choice Questions & Answers (MCQs) focuses on “Damp Proofing”.
1. DPM stands for:
a) Damp Proof Material
b) Damp Proof Mix
c) Damp Proof Member
d) Damp Proof Membrane
a) Damp Proof Material
b) Damp Proof Mix
c) Damp Proof Member
d) Damp Proof Membrane
Answer: d
Explanation: DPM is a membrane material applied to prevent dampness. It can be used for a DPC (Damp Proof Course). An example is laying a polyethylene sheet under concrete slabs.
Explanation: DPM is a membrane material applied to prevent dampness. It can be used for a DPC (Damp Proof Course). An example is laying a polyethylene sheet under concrete slabs.
2. If the soil is dry, DPC for ground floor consists of layer of:
a) Metal
b) Coarse sand
c) Fine sand
d) Concrete
a) Metal
b) Coarse sand
c) Fine sand
d) Concrete
Answer: b
Explanation: Coarse sand layer of about 75-100mm thickness is provided over the entire area under the floor. Over this, a layer of plain concrete with a ratio of 1:4:8 of 100mm thickness is laid.
Explanation: Coarse sand layer of about 75-100mm thickness is provided over the entire area under the floor. Over this, a layer of plain concrete with a ratio of 1:4:8 of 100mm thickness is laid.
3. Dampness spreads upwards from ground only.
a) True
b) False
a) True
b) False
Answer: b
Explanation: Dampness does spread from the ground upwards. In addition to this, dampness can also spread from roof downwards due to rain water.
Explanation: Dampness does spread from the ground upwards. In addition to this, dampness can also spread from roof downwards due to rain water.
4. At roof slab level over the DPC, __________ are provided.
a) Tiles
b) Concrete
c) P.C.C
d) Rubber sheet
a) Tiles
b) Concrete
c) P.C.C
d) Rubber sheet
Answer: a
Explanation: Tiles are provided to reduce the dampness. The treatment of dampness at roof level involves treating parapet and roof slab. A PCC is provided on parapet, then DPC and then tiles on roof slab.
Explanation: Tiles are provided to reduce the dampness. The treatment of dampness at roof level involves treating parapet and roof slab. A PCC is provided on parapet, then DPC and then tiles on roof slab.
5. DPC materials can be classified into:
a) 3
b) 4
c) 2
d) 5
a) 3
b) 4
c) 2
d) 5
Answer: a
Explanation: The materials can be classified into 3 categories. They are flexible material, semi rigid materials and rigid materials.
Explanation: The materials can be classified into 3 categories. They are flexible material, semi rigid materials and rigid materials.
6. DPC materials should ideally be flexible, where differential thermal movements occur.
a) True
b) False
a) True
b) False
Answer: a
Explanation: Although semi rigid and rigid materials can be used, flexible materials are the best. These do not tend to crack or puncture under differential thermal movements, between the material of roof and parapet.
Explanation: Although semi rigid and rigid materials can be used, flexible materials are the best. These do not tend to crack or puncture under differential thermal movements, between the material of roof and parapet.
7. Which of the below is an example of semi rigid DPC material?
a) Plastic sheeting
b) Cement concrete
c) Asphalt
d) Stone
a) Plastic sheeting
b) Cement concrete
c) Asphalt
d) Stone
Answer: c
Explanation: Plastic sheeting is an example of flexible material. Cement concrete and stone are examples of rigid materials.
Explanation: Plastic sheeting is an example of flexible material. Cement concrete and stone are examples of rigid materials.
8. For DPC at plinth level, which grade of concrete is used?
a) M10
b) M20
c) M25
d) M15
a) M10
b) M20
c) M25
d) M15
Answer: d
Explanation: Cement concrete is used to provide DPC at plinth level. 38-50mm thickness of M15 (1:2:4) cement concrete is provided and it serves the purpose under normal conditions.
Explanation: Cement concrete is used to provide DPC at plinth level. 38-50mm thickness of M15 (1:2:4) cement concrete is provided and it serves the purpose under normal conditions.